top of page
Linear Accelerator
SUNY Upstate University Cancer Center
The Dwyer team was enlisted to design the fit out of an existing, unfinished
vault with a new, state-of-the-art Varian True Beam Linear Accelerator.
Much of the vault required additional shielding to accommodate the
increased radiation levels emitted by the new machine. The Dwyer team
collaborated closely with the structural engineer, MEP consultants, Varian,
and Nelco, the specialty shielding product manufacturer on this
complex and compact project.
While much of the new space was to have the same aesthetic to the adjacent vaults and control areas, the team took every opportunity to improve the functionality of the space, increate storage and better workflow.
Quick Facts
Syracuse, NY
1,170 gsf
bottom of page